Tag Archives: WattBridge

UPDATE: Nova Scotia signs up to buy power from Tantramar gas plant

This article was updated on February 4, 2026 to include NB Power’s responses to a series of questions. (See below) Members of the Protect the Chignecto Isthmus Coalition (PCIC) are reacting with anger and disbelief after NB Power filed new … Continue reading

Posted in NB Power, Town of Tantramar | Tagged , , , , | 3 Comments

U.S. company promised cheaper, gas/diesel turbines with $172M in ‘economic uplift’

The company NB Power chose to build a 500 MW gas/diesel generating plant on the Chignecto Isthmus promised to supply  its PE6000 jet engine turbines at a lower cost than its competitors’ turbines while minimizing the time needed for construction … Continue reading

Posted in economic development, NB Power, Town of Tantramar | Tagged , , | 1 Comment

Docs reveal business dealings between PROENERGY & Tribal Council on Chignecto gas plant

Documents released this week by NB Power do not support claims that the Mi’kmaq had agreed to invest in the 500 MW gas/diesel plant that NB Power wants built on the Chignecto Isthmus near Centre Village. The documents do show, … Continue reading

Posted in Environment, Indigenous affairs, Town of Tantramar | Tagged , , | 7 Comments