Tag Archives: Pierre Plourde

Former deputy mayor seeks apology for town manager’s ‘rude’ behaviour

Mayor John Higham has defended a senior town manager who apparently told two Sackville residents they could not speak with an engineering consultant about the Lorne Street flood control project unless they were willing to pay for his time. The … Continue reading

Posted in Town of Sackville | Tagged , , , , | 9 Comments

Consultant outlines short-term flood control plan, but says Sackville will need to do more

A consultant with Crandall Engineering of Moncton suggests the construction of two large stormwater retention ponds east of Lorne Street will be crucial for long-term flood prevention in downtown Sackville. During a presentation to town council on Tuesday evening, Pierre … Continue reading

Posted in Town of Sackville | Tagged , , , | 5 Comments

Town plans to dig three ponds to handle Lorne St. flooding

Phase two of the Lorne Street reconstruction project will likely include three ponds to store storm water that flows into the downtown from the old Sackville quarry during heavy rains. Pierre Plourde of Crandall Engineering showed a diagram of the … Continue reading

Posted in Environment, Town of Sackville | Tagged , , , , | 6 Comments