Monthly Archives: September 2025

Mt. A. prof calls Chignecto Isthmus gas plant a ‘done deal’

Mount Allison University Politics Professor Mario Levesque says it’s increasingly evident that the proposed gas/diesel plant on the Chignecto Isthmus is a “done deal” and the only thing that could stop it would be massive protests similar to the anti-fracking … Continue reading

Posted in Mount Allison University, NB Power, New Brunswick politics, Technology | Tagged , | Leave a comment

Tantramar mayor cites differences between his letter to Rogers & the one council voted not to send to Premier Holt, NB Power & PROENERGY

Tantramar Mayor Andrew Black says there are two significant differences between his letter asking Rogers Communications to find an alternate site for its proposed cellphone tower and the letter Councillor Michael Tower wanted council to send to Premier Holt and … Continue reading

Posted in NB Power, Town of Tantramar | Tagged , | 7 Comments

Opponents of NB Power gas plant project shocked & disheartened by council vote

Opponents of the big, gas/diesel generating plant that NB Power wants built on the Chignecto Isthmus seemed shocked Tuesday night after Tantramar Town Council voted against calling for the immediate cancellation of the project. Midgic resident Juliette Bulmer told reporters … Continue reading

Posted in climate change, Town of Tantramar | Tagged , | 4 Comments

Tantramar council defeats motion to oppose 500 MW gas/diesel plant near Centre Village

In a narrow 5-4 vote Tuesday, Tantramar Town Council decided against urging the immediate cancellation of the proposed, 500 MW gas/diesel generating plant near Centre Village on the Chignecto Isthmus. The decision came after Councillor Michael Tower moved a motion, … Continue reading

Posted in climate change, Environment, NB Power, Town of Tantramar | Tagged , | 12 Comments

Town engineer cautions Sackville residents about water use, but says there’s enough for flushing the pipes in October

Tantramar’s town engineer says Sackville residents who are on the municipal water system should be cautious about how much they use as the current drought continues. At the same time, Jon Eppell says he’s confident there’s enough water to conduct … Continue reading

Posted in Town of Sackville, Town of Tantramar | Tagged | Leave a comment

Province rejects Tantramar mayor’s call for comprehensive environmental assessment of proposed NB Power gas plant

Tantramar Mayor Andrew Black says the provincial environment minister has rejected his request for a comprehensive environmental impact assessment (EIA) of the proposed 500 MW gas/diesel generating plant on the Chignecto Isthmus. During today’s town council meeting, Black said he had … Continue reading

Posted in NB Power, Town of Tantramar | Tagged | 3 Comments

Strong environmental focus at Sackville Fall Fair with activists saying ‘no’ to big gas plant on the Isthmus

Environmental activists had a strong presence Saturday at Sackville’s Fall Fair as many carried banners and rode bicycles in the parade while others distributed flyers and posters from booths run by organizations that included Seniors for Climate Tantramar, the Atlantic … Continue reading

Posted in climate change, Environment, NB Power, Town of Tantramar | Tagged , , | 8 Comments

Federal agency OK’s gas/diesel plant on the Isthmus; MLA calls for comprehensive provincial review

Tantramar MLA Megan Mitton says she’s not surprised that the Impact Assessment Agency of Canada (IAAC) has decided no further federal review is needed for the proposed 500 MW gas/diesel generating plant on the Chignecto Isthmus. “The decision is not … Continue reading

Posted in Environment, Indigenous affairs, NB Power | Tagged , , | 4 Comments

Premier Holt says there are many unanswered questions about proposed NB Power gas plant on the Isthmus

Premier Susan Holt says her government is asking many questions about the proposed gas/diesel generating plant that NB Power wants built on the Chignecto Isthmus. “There’s tonnes of questions on this project,” Holt said today after talking with Phyllis Wheaton … Continue reading

Posted in Environment, Indigenous affairs, NB Power, New Brunswick politics | Tagged , | 5 Comments

Audience member blows the whistle on NB Power

By: John Chilibeck, Local Journalism Initiative Reporter Source: The Daily Gleaner September 13, 2025 Sitting at the back of an auditorium, Randy Dickinson blasted a whistle, shocking the audience below him. The long-time advocate for people with disabilities had just … Continue reading

Posted in LJI stories, NB Power, Town of Tantramar | Tagged , | 1 Comment

Protesters march in Sackville against proposed, 500 MW gas plant near Centre Village

About 130 people attended a rally and march in Sackville Saturday to protest against NB Power’s plans for a 500 MW gas/diesel generating plant on the environmentally sensitive Chignecto Isthmus. “I can’t tell you how proud I am of how … Continue reading

Posted in climate change, Environment, NB Power, Town of Tantramar | Tagged | Leave a comment